File #: 22-500    Version: 1
Type: Action Item Status: Passed
In control: City Council
On agenda: 11/14/2022 Final action: 11/14/2022
Title: Electric vehicle charging infrastructure grant for City fleet vehicles. Ward(s): All Wards Councilor(s): All Councilors Neighborhood(s): All Neighborhoods Result Area(s): Good Governance
Attachments: 1. SAMPLE_Fleet MR Pilot Participation Agreement.pdf, 2. Fleet Partner Study - City of Salem - Shops Complex.pdf, 3. Fleet Partner Study - City of Salem - Library.pdf, 4. Series 7 - Dual Head Charger_Product Sheet.pdf, 5. Fleet Services Business Plan_2022_2027.pdf
Related files:

TO:                      Mayor and City Council   

THROUGH:                      Keith Stahley, City Manager   

FROM:                      Krishna Namburi, Enterprise Services Director

                                          

SUBJECT:

title

 

Electric vehicle charging infrastructure grant for City fleet vehicles.

 

Ward(s):  All Wards    

Councilor(s):  All Councilors    

Neighborhood(s):   All Neighborhoods    

Result Area(s):  Good Governance

end

 

SUMMARY:

summary

 

The future addition of electric vehicles to the City’s fleet requires electric vehicle charging infrastructure at the shops complex and Library parkade with a projected cost of $357,983. Portland General Electric has a “Make-Ready Infrastructure” grant program that would fund $185,609 of the total cost. The program requires matching funds of $172,373 from the City and a ten-year energy commitment. 

end

 

ISSUE:

 

Shall City Council approve applying for and accepting grant funds from the Portland General Electric Make-Ready program and authorize the use of matching funds from the City.

 

 

RECOMMENDATION:

recommendation

 

Approve applying for and accepting the grant funds from the Portland General Electric Make-Ready program and authorize the use of matching funds from the City.

 

body

 

FACTS AND FINDINGS:

 

A study was conducted by Portland General Electric (PGE) on two City fleet parking locations, the Shops complex and Library parkade rooftop. The study is based upon the City purchasing thirty-six electric vehicles over the next five years. The study proposed infrastructure for twenty (20) level 2 chargers at the shops complex and sixteen (16) level 2 chargers at the Library parkade rooftop. Each location would begin with one dual head charger with two charging cords installed at the City’s cost; additional chargers would be installed as the City acquires new electric vehicles.

 

Total City expenditures for this project with one dual head charger at each location is estimated to be $181,374.

 

The Make-Ready program requires a ten-year agreement to utilize a combined energy commitment total of 662,890 kWh, estimated to cost $61,614.

 

The study projects a potential net savings of up to $895,148 compared to conventional gas-powered vehicles.

 

Shops Complex infrastructure total cost is $206,772, this does not include any chargers. PGE would fund $96,528 and the City would fund the remaining $110,243.

One level 2 charger would be installed at the City’s cost, estimated to be $4,500 including a $1,000 grant from PGE.

 

Library parkade rooftop infrastructure total cost is $151,211, this does not include any chargers. PGE would fund $$89,081 and the City would fund the remaining $62,130.

One level 2 charger would be installed at the City’s cost, estimated to be $4,500 including a $1,000 grant from PGE.

 

The City’s portion of the project would be funded out of the Fleet Services operating budget.

 

Construction completion for the infrastructure is currently projected for early 2024.

 

 

BACKGROUND:

 

The City’s Climate Action Plan strategy #TL 30 calls for the “transition of all City-owned fleet to electric vehicles with a priority emphasis on first replacing gas-powered vehicles.”

 

The City has ordered the first electric vehicle (EV) while no significant electric charging infrastructure exists. The proposed infrastructure project will allow the City to install electric charging stations as the City’s EV fleet grows.

 

                     Jim Schmidt     

                     Service Technologies Manager    

 

Attachments:

1.                     SAMPLE_Fleet MR Pilot Participation Agreement

2.                     Fleet Partner Study - City of Salem - Shops Complex

3.                     Fleet Partner Study - City of Salem - Library

4.                     Series 7 - Dual Head Charger_Product Sheet

5.                     Fleet Services Business Plan_2022_2027