File #: 25-62    Version: 1
Type: Action Item Status: Passed
In control: City Council
On agenda: 2/24/2025 Final action: 2/24/2025
Title: Request to create a mid-year project for sanitary sewer rehabilitation in the vicinity of Waldo Avenue SE and Wildwind Drive SE Ward(s): Ward 2 Councilor(s): Nishioka Neighborhood(s): South Central Association of Neighbors (SCAN) Result Area(s): Safe, Reliable and Efficient Infrastructure
Attachments: 1. Attachment 1 - WALDO-WILDWIND PROJECT LOCATION MAP.pdf
Related files:

TO:                      Mayor and City Council   

THROUGH:                      Krishna Namburi, Acting City Manager   

FROM:                      Brian D. Martin, PE, Public Works Director  

                                          

SUBJECT:

title

 

Request to create a mid-year project for sanitary sewer rehabilitation in the vicinity of Waldo Avenue SE and Wildwind Drive SE    

 

Ward(s): Ward 2    

Councilor(s): Nishioka    

Neighborhood(s):  South Central Association of Neighbors (SCAN)    

Result Area(s): Safe, Reliable and Efficient Infrastructure

end

 

SUMMARY:

summary

 

The Waldo Avenue SE/Wildwind Drive SE - Pipe Rehabilitation is currently programmed for funding in fiscal year 2029 in the 5-year CIP. After a recent emergency repair and inspection of the sewer main, staff have determined that rehabilitation of the sewer is urgent. Council approval to create a mid-year wastewater project in the FY 2025 construction budget will allow design activities to begin immediately.    

end

 

ISSUE:

 

Shall City Council authorize the creation of a mid-year sanitary sewer project - “Waldo Avenue SE/Wildwind Drive SE - Pipe Rehabilitation” in the FY 2025 Wastewater Non-Assessed Construction Fund 255, funded with Utility Rates?

   

 

 

RECOMMENDATION:

recommendation

 

Authorize the creation of a mid-year sanitary sewer project - “Waldo Avenue SE/Wildwind Drive SE - Pipe Rehabilitation” in the FY 2025 Wastewater Non-Assessed Construction Fund 255, funded with Utility Rates.    

 

body

 

FACTS AND FINDINGS:

 

                     A sanitary sewer overflow recently occurred in the proposed project area. After completing an emergency repair and inspecting the pipe, it was determined that the project is more urgent than originally planned.

                     The project will rehabilitate approximately 1,050 linear feet of 6-inch diameter concrete pipe and approximately 515 linear feet of 8-inch diameter concrete pipe in the vicinity of Waldo Avenue SE and Wildwind Drive SE as shown in the attached Project Location Map.

                     Additional pipeline and access easements are necessary on selected properties along the sewer alignment.

                     The total estimated project cost to design and construct the Waldo Avenue SE/Wildwind Drive SE - Pipe Rehabilitation project is $990,000.

                     Utility Rate funds have been identified to fund the project.

                     There is sufficient funding and expenditure authority in the adopted Wastewater Non-Assessed fund’s Unspecified project category, to fund $150,000 for design in FY 2025. The remaining amount of $840,000 for construction will be programmed in FY 2026.    

BACKGROUND:

 

Every fiscal year unspecified funds are budgeted in each capital improvement category. They are available for unforeseen conditions arising within existing projects or to address new urgent projects that come up during the fiscal year. The FY25 budget for wastewater capital improvements includes $1,477,130 in unspecified funds from wastewater utility rates.   

  

                     Allen Dannen, PE,   

                     City Engineer   

 

Attachments:

1. Attachment 1 - Waldo-Wildwind Project Location Map