File #: 23-363    Version: 1
Type: Action Item Status: Passed
In control: City Council
On agenda: 10/23/2023 Final action: 10/23/2023
Title: Revised Staff Report - Proposed process and criteria for selecting projects as part of the pedestrian crossings, sidewalk infill, and sidewalk replacement categories contained in the 2022 Salem Safety and Livability Bond Measure. Ward(s): All Wards Councilor(s): All Councilors Neighborhood(s): All Neighborhoods Result Area(s): Safe, Reliable and Efficient Infrastructure.
Related files:

TO:                      Mayor and City Council   

THROUGH:                      Keith Stahley, City Manager   

FROM:                      Brian D. Martin, PE, Public Works Director  

                                          

SUBJECT:

title

 

Revised Staff Report - Proposed process and criteria for selecting projects as part of the pedestrian crossings, sidewalk infill, and sidewalk replacement categories contained in the 2022 Salem Safety and Livability Bond Measure.     

 

Ward(s): All Wards    

Councilor(s): All Councilors    

Neighborhood(s):  All Neighborhoods    

Result Area(s): Safe, Reliable and Efficient Infrastructure.

end

 

SUMMARY:

summary

The 2022 Salem Safety and Livability Bond Measure included three transportation-related project categories relating to sidewalks and pedestrian crossings without identified locations. The bond measure indicated that locations for these projects would be determined by City Council. This report recommends a process and criteria for Council to follow in determining project locations. It also recommends allocating a portion of these funds to be delivered together with pavement projects on Liberty Street SE, Silverton Road NE, and Commercial Street SE.    

end

 

ISSUE:

 

Shall City Council direct staff to follow the process and apply the criteria described in this report and recommended by the Bond Oversight Steering Committee to develop recommended project locations for the pedestrian crossings, sidewalk infill, and sidewalk replacement categories included in the 2022 Salem Safety and Livability Bond Measure, and further authorize allocation of a portion ($1,168,000) of the sidewalk replacement funds for projects located adjacent to the Liberty Street SE, Silverton Road NE, and Commercial Street SE pavement projects?   

 

RECOMMENDATION:

recommendation

Direct staff to follow the process and apply the criteria described in this report and recommended by the Bond Oversight Steering Committee to develop recommended project locations for the pedestrian crossings, sidewalk infill, and sidewalk replacement categories included in the 2022 Salem Safety and Livability Bond Measure, and further authorize allocation of a portion ($1,168,000) of the sidewalk replacement funds for projects located adjacent to the Liberty Street SE, Silverton Road NE, and Commercial Street SE pavement projects.    

body

 

FACTS AND FINDINGS:

 

The Bond Oversight Steering Committee (Steering Committee) discussed and provided input on the selection process and criteria for the pedestrian crossings, sidewalk infill, and sidewalk replacement categories at meetings in March, April, June, and August 2023. At their meeting on August 31, 2023, the Steering Committee recommended a process and criteria for selecting locations as part of these three bond categories.

 

Project Selection Process and Criteria

The recommended process to select locations for the pedestrian crossings, sidewalk infill, and sidewalk replacement categories of funds includes opportunities for public input with oversight by the Steering Committee prior to bringing a recommendation to City Council. The following steps outline the recommended process. It is anticipated that this process will take between 14 and 21 months to complete.

 

                     Seeking public input on possible locations. Possible locations will also be drawn from existing records of requests through the Safer Pedestrian Crossings Program and the Sidewalk Repair Program.

 

                     Evaluate locations against criteria. Identified locations will then be evaluated against the recommended criteria contained in Table 1.

 

                     Develop cost estimates. Staff will propose projects to the Steering Committee that address top ranking locations and will develop cost estimates.

 

                     Preliminary recommendations. The Steering Committee will develop preliminary recommendations for each of the three categories. The preliminary recommendation will consider the potential for nearby development, cost of projects, efficiency of delivery, and how a project contributes to creating a complete network.

 

                     Seek public input. The Steering Committee will seek public input on the preliminary recommendations and finalize their recommendation to City Council.

 

                     City Council approval of locations.

 

 

 

 

 

Table 1.
Recommended Criteria for Evaluating Locations in Pedestrian & Sidewalk Bond Categories

 

Criteria

Pedestrian Crossings

Sidewalk Infill

Sidewalk Replacement

Equity

25%

25%

25%

Street Classification

25%

25%

6%

Proximity to Schools

10%

15%

8%

Proximity to Transit

10%

20%

8%

Proximity to Parks

10%

15%

8%

Distance to Nearest Crossing

10%

-

-

Pedestrian Crashes

10%

-

-

Hazard Assessment

-

-

45%

Total

100%

100%

100%

 

 

Allocation of Sidewalk Replacement Funds - Liberty Street SE and Silverton Road NE

The Steering Committee reviewed candidates for sidewalk replacement, sidewalk infill, and pedestrian crossings in proximity to bond paving projects on Liberty Street SE (anticipated 2024), Silverton Road NE (anticipated 2025 to 2026), and Commercial Street SE (anticipated 2024). Coordinating delivery of sidewalk projects with pavement projects provides efficiencies due to economies of scale in both design and construction costs. Additionally, connecting these projects can result in more complete connections for pedestrians.

 

At its meeting on June 29, 2023, the Steering Committee recommended allocating bond funds from the sidewalk replacement category to locations adjacent to the Liberty Street SE, Silverton Road NE, and Commercial Street SE projects as described below.

 

Liberty Street SE

This pavement project is anticipated to proceed to construction in 2024. The project extent is from Mill Street SE to Trade Street SE. The sidewalk along the west side of Liberty Street is not passable by people with limited mobility. The estimated cost to replace the sidewalk in conjunction with the pavement project is $536,000.

 

Silverton Road NE

This pavement project is anticipated to proceed to construction in 2025 and 2026. The project extent is from 17th Street NE to Williams Avenue NE and from Beacon Street NE to Fisher Road NE. There are several segments of sidewalks needing replacement in the vicinity of this pavement project. The Steering Committee recommended that funding be allocated to replace sidewalks along the north side of Silverton Road NE in order to create a continuous accessible route along the project. The recommended allocation of bond funds is for segments between Abrams Avenue NE and Fairhaven Avenue NE, with a total estimated cost of $592,000. Additional segments located between 17th Street NE and Beach Avenue NE are being recommended for funding through the Urban Renewal Agency.

 

Commercial Street SE

This pavement project is anticipated to proceed to construction in 2024. The project extent is from Fabry Road SE to the on-ramps for Interstate-5. There is a short segment of sidewalk along the west side, north of Fairway Avenue SE that needs replacement. The estimated cost to replace this section of sidewalk in conjunction with the pavement project is $40,000.    

 

BACKGROUND:

 

Residents of Salem approved a $300 million community improvement bond measure in November of 2022. Of this amount, $157 million was allocated to address transportation infrastructure needs. Most of these projects were identified by location; however, the bond included three categories to address pedestrian crossings, sidewalk infill, and sidewalk replacement, with specific locations to be determined by City Council. The bond funding available for each of these categories is included in Table 2.

 

Table 2.

Sidewalk and Pedestrian Categories

 

Bond Category

Description

Funding Programmed

Safer Pedestrian Crossings

Median Islands, Lighting, Rectangular Rapid Flashing Beacons, & ADA Ramps

$3,540,000

Sidewalk Infill

Missing Sidewalks

$6,000,000

Sidewalk Replacement

Replace Failing Sidewalk Panels

$8,710,000

 

    

                     Robert D. Chandler, PhD, PE     

                     Assistant Public Works Director